VN Process – Vision Nouvelle

Workshop & Quali'FAT

In our building, 30 minutes from Lyon, we gathered everything needed for a turnkey project: fabrication, electrical assembly, storage and a fully equipped test area.

VN Process fabrication workshop

Fabrication workshop

A dedicated workshop sized for skids and large assemblies.

  • Orbital and TIG welding stations
  • Pipe cutting, band saw
  • Electrical-automation area: assembly shop and parts store
Dedicated floor area
350 m²
Access doors
2 × 4 × 4 m
Clear height
7 m
Overhead crane
2,500 kg
Skid being built in the workshop

Quali'FAT, every utility in one place

To pre-assemble, test and qualify equipment or installations: a unique concept gathering every need of your project in one place.

Why outsource your tests

  • Outsource pre-assembly, FAT and shipping to site
  • Reduce production shutdowns by running tests and qualification in parallel
  • Simplify schedule management
Quali'FAT utilities area

Available utilities

Three-phase power
36 kVA
Clean steam
100 kg/h
Temperature-controlled water
+4 to +121 °C
Softened and purified water
Yes
Clean dry compressed air
Yes
Chilled and hot water
Yes

Complementary services

  • Assembly and connections on our premises
  • Test preparation: protocols, scheduling
  • Test execution
  • Documented dismantling, packing, delivery, reassembly
  • Modifications and adaptations: piping, electrical
  • Metrological checks
Equipment under test in the Quali'FAT area

Easy to reach

  • 30 min from central Lyon
  • 5 min from the A40 motorway
  • 20 min from Lyon Saint-Exupéry airport
  • 5 min from the railway station, connections to Lyon all day

Access map and deliveries

VN Process delivery van

Book Quali'FAT

Tell us about your equipment and tests: we prepare the area, the utilities and the protocol.

Contact us 04 74 37 17 80